{"identifier":"/us/usc/t10/s6274","title":10,"num":"\u00a7\u202f6274.","heading":"General plant projects","text":"\u00a7\u202f6274.\nGeneral plant projects\nPlant or construction projects for which amounts are made available under this and subsequent appropriation Acts\n1\n1 See References in Text note below.","url":"https://projectusc.org/usc/t10/s6274.html","content":[{"t":"sec","id":"/us/usc/t10/s6274","children":[{"t":"num","text":"\u00a7\u202f6274."},{"t":"heading","text":"General plant projects"},{"t":"content","text":"\n","children":[{"t":"p","text":" Plant or construction projects for which amounts are made available under this and subsequent appropriation Acts\u202f","children":[{"t":"ref","text":"1"},{"t":"num","text":"1","tail":"\u202fSee References in Text note below."},{"t":"text","text":"\u202fSee References in Text note below.","tail":" with a current estimated cost of less than $10,000,000 are considered for purposes of section 6273 as a plant project for which the approved total estimated cost does not exceed the minor construction threshold and for purposes of section 6275 as a construction project with a current estimated cost of less than a minor construction threshold."}],"tail":"\n"}]},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}