{"identifier":"/us/usc/t14/s1134","title":14,"num":"\u00a7\u202f1134.","heading":"Acquisition, production, deployment, and support","text":"\u00a7\u202f1134.\nAcquisition, production, deployment, and support\n(a)\nIn General.\u2014\nThe Commandant shall\u2014\n(1) ensure there is a stable and efficient production and support capability to develop an asset or capability for the Coast Guard;\n(2) conduct follow-on testing to confirm and monitor performance and correct deficiencies; and\n(3) conduct acceptance tests and trials prior to the delivery of each asset or system to ensure the delivered asset or system achieves full operational capability.\n(b)\nElements.\u2014\nThe Commandant shall\u2014\n(1) execute production contracts;\n(2) ensure that delivered assets and capabilities meet operational cost and schedules requirements established in the acquisition program baseline;\n(3) validate manpower and training requirements to meet system needs to operate, maintain, support, and instruct the assets or capabilities; and\n(4) prepare an acquisition project or program transition plan to enter into programmatic sustainment, operations, and support.","url":"https://projectusc.org/usc/t14/s1134.html","content":[{"t":"sec","id":"/us/usc/t14/s1134","children":[{"t":"num","text":"\u00a7\u202f1134."},{"t":"heading","text":"Acquisition, production, deployment, and support"},{"t":"subsec","id":"/us/usc/t14/s1134/a","children":[{"t":"num","text":"(a)"},{"t":"heading","text":"In General.\u2014"},{"t":"chapeau","text":"The Commandant shall\u2014"},{"t":"para","id":"/us/usc/t14/s1134/a/1","children":[{"t":"num","text":"(1)"},{"t":"content","text":" ensure there is a stable and efficient production and support capability to develop an asset or capability for the Coast Guard;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t14/s1134/a/2","children":[{"t":"num","text":"(2)"},{"t":"content","text":" conduct follow-on testing to confirm and monitor performance and correct deficiencies; and","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t14/s1134/a/3","children":[{"t":"num","text":"(3)"},{"t":"content","text":" conduct acceptance tests and trials prior to the delivery of each asset or system to ensure the delivered asset or system achieves full operational capability.","tail":"\n"}],"tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t14/s1134/b","children":[{"t":"num","text":"(b)"},{"t":"heading","text":"Elements.\u2014"},{"t":"chapeau","text":"The Commandant shall\u2014"},{"t":"para","id":"/us/usc/t14/s1134/b/1","children":[{"t":"num","text":"(1)"},{"t":"content","text":" execute production contracts;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t14/s1134/b/2","children":[{"t":"num","text":"(2)"},{"t":"content","text":" ensure that delivered assets and capabilities meet operational cost and schedules requirements established in the acquisition program baseline;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t14/s1134/b/3","children":[{"t":"num","text":"(3)"},{"t":"content","text":" validate manpower and training requirements to meet system needs to operate, maintain, support, and instruct the assets or capabilities; and","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t14/s1134/b/4","children":[{"t":"num","text":"(4)"},{"t":"content","text":" prepare an acquisition project or program transition plan to enter into programmatic sustainment, operations, and support.","tail":"\n"}],"tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}