{"identifier":"/us/usc/t15/s7307","title":15,"num":"\u00a7\u202f7307.","heading":"National Construction Safety Team report","text":"\u00a7\u202f7307.\nNational Construction Safety Team report\nNot later than 90 days after completing an investigation, a Team shall issue a public report which includes\u2014\n(1) an analysis of the likely technical cause or causes of the building failure investigated;\n(2) any technical recommendations for changes to or the establishment of evacuation and emergency response procedures;\n(3) any recommended specific improvements to building standards, codes, and practices; and\n(4) recommendations for research and other appropriate actions needed to help prevent future building failures.","url":"https://projectusc.org/usc/t15/s7307.html","content":[{"t":"sec","id":"/us/usc/t15/s7307","children":[{"t":"num","text":"\u00a7\u202f7307."},{"t":"heading","text":"National Construction Safety Team report","tail":"\n"},{"t":"chapeau","text":"Not later than 90 days after completing an investigation, a Team shall issue a public report which includes\u2014"},{"t":"para","id":"/us/usc/t15/s7307/1","children":[{"t":"num","text":"(1)"},{"t":"content","text":" an analysis of the likely technical cause or causes of the building failure investigated;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t15/s7307/2","children":[{"t":"num","text":"(2)"},{"t":"content","text":" any technical recommendations for changes to or the establishment of evacuation and emergency response procedures;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t15/s7307/3","children":[{"t":"num","text":"(3)"},{"t":"content","text":" any recommended specific improvements to building standards, codes, and practices; and","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t15/s7307/4","children":[{"t":"num","text":"(4)"},{"t":"content","text":" recommendations for research and other appropriate actions needed to help prevent future building failures.","tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"}]}]}