{"identifier":"/us/usc/t16/s460l\u201321","title":16,"num":"\u00a7\u202f460l\u201321.","heading":"Definitions","text":"\u00a7\u202f460l\u201321.\nDefinitions\nAs used in this part:\n(a) The term \u201cproject\u201d shall mean a project or any appropriate unit thereof.\n(b) The term \u201cseparable costs,\u201d as applied to any project purpose, means the difference between the capital cost of the entire multiple-purpose project and the capital cost of the project with the purpose omitted.\n(c) The term \u201cjoint costs\u201d means the difference between the capital cost of the entire multiple-purpose project and the sum of the separable costs for all project purposes.\n(d) The term \u201cfeasibility report\u201d shall mean any report of the scope required by the Congress when formally considering authorization of the project of which the report treats.\n(e) The term \u201ccapital cost\u201d includes interest during construction, wherever appropriate.","url":"https://projectusc.org/usc/t16/s460l\u201321.html","content":[{"t":"sec","id":"/us/usc/t16/s460l\u201321","children":[{"t":"num","text":"\u00a7\u202f460l\u201321."},{"t":"heading","text":"Definitions","tail":"\n"},{"t":"chapeau","text":"As used in this part:"},{"t":"subsec","id":"/us/usc/t16/s460l\u201321/a","children":[{"t":"num","text":"(a)"},{"t":"content","text":" The term \u201cproject\u201d shall mean a project or any appropriate unit thereof.","tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t16/s460l\u201321/b","children":[{"t":"num","text":"(b)"},{"t":"content","text":" The term \u201cseparable costs,\u201d as applied to any project purpose, means the difference between the capital cost of the entire multiple-purpose project and the capital cost of the project with the purpose omitted.","tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t16/s460l\u201321/c","children":[{"t":"num","text":"(c)"},{"t":"content","text":" The term \u201cjoint costs\u201d means the difference between the capital cost of the entire multiple-purpose project and the sum of the separable costs for all project purposes.","tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t16/s460l\u201321/d","children":[{"t":"num","text":"(d)"},{"t":"content","text":" The term \u201cfeasibility report\u201d shall mean any report of the scope required by the Congress when formally considering authorization of the project of which the report treats.","tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t16/s460l\u201321/e","children":[{"t":"num","text":"(e)"},{"t":"content","text":" The term \u201ccapital cost\u201d includes interest during construction, wherever appropriate.","tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}