{"identifier":"/us/usc/t2/s1816a","title":2,"num":"\u00a7\u202f1816a.","heading":"Design-build contracts","text":"\u00a7\u202f1816a.\nDesign-build contracts\n(a) Notwithstanding any other provision of law, the Architect of the Capitol may use the two-phase selection procedures authorized in\nsection 3309 of title 41\n(b) This section shall apply with respect to fiscal year 2008 and each succeeding fiscal year.","url":"https://projectusc.org/usc/t2/s1816a.html","content":[{"t":"sec","id":"/us/usc/t2/s1816a","children":[{"t":"num","text":"\u00a7\u202f1816a."},{"t":"heading","text":"Design-build contracts"},{"t":"subsec","id":"/us/usc/t2/s1816a/a","children":[{"t":"num","text":"(a)"},{"t":"content","text":" Notwithstanding any other provision of law, the Architect of the Capitol may use the two-phase selection procedures authorized in ","children":[{"t":"ref","text":"section 3309 of title 41","href":"/us/usc/t41/s3309","tail":" for entering into a contract for the design and construction of a public building, facility, or work in the same manner and under the same terms and conditions as the head of an executive agency under such section."}],"tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t2/s1816a/b","children":[{"t":"num","text":"(b)"},{"t":"content","text":" This section shall apply with respect to fiscal year 2008 and each succeeding fiscal year.","tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}