{"identifier":"/us/usc/t33/s2326f","title":33,"num":"\u00a7\u202f2326f.","heading":"Maintenance dredging data","text":"\u00a7\u202f2326f.\nMaintenance dredging data\n(a)\nIn general\nThe Secretary shall establish, maintain, and make publicly available a database on maintenance dredging carried out by the Secretary, which shall include information on maintenance dredging carried out by Federal and non-Federal vessels.\n(b)\nScope\nThe Secretary shall include in the database maintained under subsection (a), for each maintenance dredging project and contract, estimated and actual data on\u2014\n(1) the volume of dredged material removed;\n(2) the initial cost estimate of the Corps of Engineers;\n(3) the total cost, including a separate line item for all Federal costs associated with the disposal of dredged material;\n(4) the party and vessel carrying out the work; and\n(5) the number of private contractor bids received and the bid amounts, including bids that did not win the final contract award.","url":"https://projectusc.org/usc/t33/s2326f.html","content":[{"t":"sec","id":"/us/usc/t33/s2326f","children":[{"t":"num","text":"\u00a7\u202f2326f."},{"t":"heading","text":"Maintenance dredging data"},{"t":"subsec","id":"/us/usc/t33/s2326f/a","children":[{"t":"num","text":"(a)"},{"t":"heading","text":"In general"},{"t":"content","children":[{"t":"p","text":"The Secretary shall establish, maintain, and make publicly available a database on maintenance dredging carried out by the Secretary, which shall include information on maintenance dredging carried out by Federal and non-Federal vessels.","tail":"\n"}],"tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t33/s2326f/b","children":[{"t":"num","text":"(b)"},{"t":"heading","text":"Scope"},{"t":"chapeau","text":"The Secretary shall include in the database maintained under subsection (a), for each maintenance dredging project and contract, estimated and actual data on\u2014"},{"t":"para","id":"/us/usc/t33/s2326f/b/1","children":[{"t":"num","text":"(1)"},{"t":"content","text":" the volume of dredged material removed;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t33/s2326f/b/2","children":[{"t":"num","text":"(2)"},{"t":"content","text":" the initial cost estimate of the Corps of Engineers;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t33/s2326f/b/3","children":[{"t":"num","text":"(3)"},{"t":"content","text":" the total cost, including a separate line item for all Federal costs associated with the disposal of dredged material;","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t33/s2326f/b/4","children":[{"t":"num","text":"(4)"},{"t":"content","text":" the party and vessel carrying out the work; and","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t33/s2326f/b/5","children":[{"t":"num","text":"(5)"},{"t":"content","text":" the number of private contractor bids received and the bid amounts, including bids that did not win the final contract award.","tail":"\n"}],"tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}