{"identifier":"/us/usc/t49/s24906","title":49,"num":"\u00a7\u202f24906.","heading":"Eliminating highway at-grade crossings","text":"\u00a7\u202f24906.\nEliminating highway at-grade crossings\n(a)\nPlan.\u2014\nIn consultation with the States on the main line of the Northeast Corridor, the Secretary of Transportation shall develop a plan not later than\n(1) impracticable or unnecessary; and\n(2) using the crossing is consistent with conditions the Secretary considers appropriate to ensure safety.\n(b)\nAmtrak\u2019s Share of Costs.\u2014\nAmtrak shall pay 20 percent of the cost of eliminating each highway at-grade crossing under the plan.","url":"https://projectusc.org/usc/t49/s24906.html","content":[{"t":"sec","id":"/us/usc/t49/s24906","children":[{"t":"num","text":"\u00a7\u202f24906."},{"t":"heading","text":"Eliminating highway at-grade crossings"},{"t":"subsec","id":"/us/usc/t49/s24906/a","children":[{"t":"num","text":"(a)"},{"t":"heading","text":"Plan.\u2014"},{"t":"chapeau","text":"In consultation with the States on the main line of the Northeast Corridor, the Secretary of Transportation shall develop a plan not later than ","children":[{"t":"text","text":"September 30, 1993","tail":", to eliminate all highway at-grade crossings of the main line by not later than "},{"t":"text","text":"December 31, 1997","tail":". The plan may provide that eliminating a crossing is not required if\u2014"}]},{"t":"para","id":"/us/usc/t49/s24906/a/1","children":[{"t":"num","text":"(1)"},{"t":"content","text":" impracticable or unnecessary; and","tail":"\n"}],"tail":"\n"},{"t":"para","id":"/us/usc/t49/s24906/a/2","children":[{"t":"num","text":"(2)"},{"t":"content","text":" using the crossing is consistent with conditions the Secretary considers appropriate to ensure safety.","tail":"\n"}],"tail":"\n"}],"tail":"\n"},{"t":"subsec","id":"/us/usc/t49/s24906/b","children":[{"t":"num","text":"(b)"},{"t":"heading","text":"Amtrak\u2019s Share of Costs.\u2014"},{"t":"content","text":"Amtrak shall pay 20 percent of the cost of eliminating each highway at-grade crossing under the plan.","tail":"\n"}],"tail":"\n"},{"t":"text","text":"\n"},{"t":"text","text":"\n"}]}]}